EV Charging Station Integration

Vgg systems | High Voltage, PV Solar, Microgrids, Charging Infrastructure

Overview

Code Compliance

We ensure code compliance for electrical and solar projects for both Utility-scale and C&I projects. Compliance with NEC, NESC, GO95, GO128, IEEE codes is critical to smooth construction and operation of any electrical system.

Electrical Studies

We perform variety of electrical studies including short circuit and arc flash studies using ETAP or SKM software, in addition to pole loading calculations using Ocalc.  

Independent Engineering

An independent review of the drawings, specifications, & equipment will minimize project risk and construction delays. We uncover deficiencies in project design and identify difficulties that may arise during the construction and operational phases of electrical substations, distribution and transmission lines, solar & storage systems.  

Preparation of Owner’s EPC Criteria

We prepare specifications, evaluate equipment selections, review initial designs and interconnection, and prepare design criteria for use in detailed engineering. Our work starts with reviewing the detailed engineering, overseeing the work of other engineers or contractors representing the Owner’s interests throughout project execution.      

Get Insightful engineering expert opinion for energy and electrical Infrastructure, high voltage T&D, solar PV, EV charging stations, battery storage, microgrids.