State : CA
Size : Three SFMTA Bus Yards
Year : 2020
EPC company : SFMTA- WSP
Role : Battery Electric Bus (BEB) Infrastructure Assessment
Vgg systems | High Voltage, PV Solar, Microgrids, Charging Infrastructure
State : Bloomington, Utah
Size : 2MW
Year : 2018
EPC company : Enerparc
Role : Design & Engineering of 4.16KV Interconnection
Vgg systems | High Voltage, PV Solar, Microgrids, Charging Infrastructure
State : Rhode Island
Size : 10 MW
Year : 2019
EPC company : Enerparc
Role : MV Electrical Design
Vgg systems | High Voltage, PV Solar, Microgrids, Charging Infrastructure
State : California
Size : 8.5MW
Year : 2018
EPC company : Cenergy Power
Role : Electrical PE For Entire Project, 12KV Interconnection
Vgg systems | High Voltage, PV Solar, Microgrids, Charging Infrastructure
State : California, Cove Elementary School
Size : 72KW
Year : 2015
EPC company : Cenergy Power
Role : Electrical PE For Entire Project
Vgg systems | High Voltage, PV Solar, Microgrids, Charging Infrastructure
State : California
Size : 500KW
Year : 2016
EPC company : Cenergy Power
Role : Electrical Pe For Entire Project
Vgg systems | High Voltage, PV Solar, Microgrids, Charging Infrastructure
State : 7th Standard, California
Size : 115kV-21kV Substation
Year : 2011
EPC company : PG&E
Role : Electrical Designer for Entire Project

Get Insightful engineering expert opinion for energy and electrical Infrastructure, high voltage T&D, solar PV, storage, microgrids.

Contact

701 Taylor Street, San Francisco, CA 94108
415-323-5597
Vgg systems | High Voltage, PV Solar, Microgrids, Charging Infrastructure
Copyrights © 2020 vggsystems. All Rights Reserved